INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

HECRAS Dam Breach Problems

HECRAS Dam Breach Problems

HECRAS Dam Breach Problems

(OP)
I've created a HEC project to simulate a dam breach, and it's currently running with no errors. However...

I have an inflow hydrograph flowing into the most upstream XS that has a flow rate of 0.5 cfs. As far as I can tell I have no other inflows whatsoever. I also set the pond elevation at 994.75 (set this condition via the XS directly up from the dam). However, once the dam breaches one hour into the model, the water elevation at the breach never drops--the pond keeps refilling. There's definitely something going on with the DS stations immediately after the dam as their XS profiles are flattened quite a bit (due to exaggerated EG... what does that stand for, anyway?).

I've uploaded the project directory (in a zip file) to the DropBox link below. There should be just one prj file (I think Brackett'sCreek2.prj). I have also included a screen shot of the main screen showing the Project, Plan, Geometry and Unsteady flow files to make sure the right ones are selected. Also, I set my time step at 6 seconds.

https://www.dropbox.com/sh/ayv07lcccyyfiue/AABVEct...

A little more information...

I've been applying every "solution" I find on the web trying to fix the problem but to no avail. I've gone through PPT presentations on common errors and how to fix/avoid them, I even used the troubleshooter on this site, etc., etc.

Browsing through the information in HEC RAS, in the standard profile output table I have EG Elev's in the hundreds of millions and EG Slopes in the billions and tens of billions. Something is obviously very, very wrong here... I feel like I'm doing nothing but sitting here spinning my wheels.

There are a few other things I can do (clean up my XS's a bit since they were extrapolated from lidar in Civil 3D), etc., but again, it seems like there must be something very obvious that I must be overlooking.

Any input would be greatly appreciated!!!

RE: HECRAS Dam Breach Problems

(OP)
Thanks to a terrific guy over at "The RAS Solution", my model is now up and running!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources