INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Curing fresh concrete in cold weather conditions

Curing fresh concrete in cold weather conditions

Curing fresh concrete in cold weather conditions

(OP)
Your comments are solicited regarding a 12' x 3' x 3' mass concrete element placed within forms in an over-sized excavation 16' x 6' x 6' which filled with groundwater (placement in wetlands near sea level) after placement and then the groundwater froze with overnight temp of 26 degree F. The next morning the element was encased to the top of concrete within a chunk of ice and near-freezing water. Clearly this does not meet the spirit of ACI 306.1 requirements for curing concrete in cold weather conditions. But realistically, what negative impact will this "out-of-spec" curing temperature have on the strength and durability of the element? No additional water was mixed with the concrete as placed so the w/c ratio was not really affected. Does your answer depend upon the type of element (footing, beam, anchor, etc...) and/or the loading? Curious to hear your responses, thanks!

RE: Curing fresh concrete in cold weather conditions

the key to concrete freezing is whether initial set occurred. apart from nobody knowing what your application is..... the concrete could be evaluated against some better controlled elements with surface hardness testing techniques like windsor probes or swiss hammer. in combination of good thorough inspection for cracks

RE: Curing fresh concrete in cold weather conditions

(OP)
the element is an anchor for a guyed tower that will ultimately be 2 feet below grade! yep, the key is did any of the concrete freeze before initial set!?!

RE: Curing fresh concrete in cold weather conditions

you need to keep the temperature above freezing top and bottom for the entire curing period, not just initial set. and in cold weather, the strength gain will be much slower, so instead of 7 days it might take double that.

RE: Curing fresh concrete in cold weather conditions

to clarify... my comment assumes people are doing the right thing after they encountered the problem and just wanted to know how to tell if the game is already lost. the surface should be the hardest hit, if you can establish that the most susceptible is good. if you do have any weak spots, there is always coring... but i would look at surface testing first.

RE: Curing fresh concrete in cold weather conditions

Certainly you knew that freezing temperatures were on the way so why did you place the concrete without taking suitable measures? Just playing with quality, eh? Quality is a poor cousin to schedule.

RE: Curing fresh concrete in cold weather conditions

(OP)
Thanks to all for your comments, perspectives, interpretations, etc... I was really just hoping to get what I got - some thoughts from industry colleagues. To clarify from my end though... "I" am not the contractor/sub-contractor who scheduled and placed the concrete during cold weather conditions and then did not take appropriate protection measures. Nor am I the owner or his design engineer who is obviously concerned with ultimate performance of this element. I am an independent inspection agency whose scope of work was to perform foundation inspection, to monitor and test the fresh placed concrete, and to cast and test compressive strength specimens. Failure to adhere to ACI 306.1 has been documented in our reports. Thanks again!

RE: Curing fresh concrete in cold weather conditions

Did you get temps of the concrete as when installed? What was the time lapse from placement a sub freezing? Water temp when concrete placed and what did the air water temp do? Do a test with the mix and a freezer and refrigerator to mimic conditions in the field. Monitor the heat gain in the mix over time.

Richard A. Cornelius, P.E.
WWW.amlinereast.com

RE: Curing fresh concrete in cold weather conditions

If I understand the post placement conditions, the area around the concrete was flooded and only a cake of ice developed on the water surface while below the ice the water was near freezing but did not freeze. If I understand that correctly, then the detriment to the concrete is likely only delayed strength gain. If the concrete surface did not freeze, then you dodged a bullet!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.