INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Concrete Moment Frame Beam

Concrete Moment Frame Beam

Concrete Moment Frame Beam

(OP)
What's the typical detail in your firms on how far additional top bars at columns are extended? I have seen L/4 and L/3. Would appreciate if anyone had a typical detail that you could share.

We are putting together a spreadsheet for moment frame beams based on ETABS outputs and wanted to add checks to ensure that the reinforcement is developed past the point it's not needed.

RE: Concrete Moment Frame Beam

Those are typical extensions for non moment frame beams but I doubt they'd be sufficient for moment frame beams. In a symmetrical setup with lateral loads dominating, your inflection points are near midspan, right?

I like to debate structural engineering theory -- a lot. If I challenge you on something, know that I'm doing so because I respect your opinion enough to either change it or adopt it.

RE: Concrete Moment Frame Beam

(OP)
Yes it is. You would have continuous top reinforcement supplemented with additional top reinforcement at the supports. The key is to find out the right balance between the continuous bars and added bars that results in maximum efficiency. I am trying to see if there's a good starting point (L/3) or (L/4).

RE: Concrete Moment Frame Beam

Ahh... That bi-triangular moment diagram would suggest that your steel demand would drop by half at the 1/4 points. Following that logic and developing those bars past inflection, L/3 seems as though it would be the way to go.

I like to debate structural engineering theory -- a lot. If I challenge you on something, know that I'm doing so because I respect your opinion enough to either change it or adopt it.

RE: Concrete Moment Frame Beam

I've always used L/3 for the cutoff length but as you mentioned, include continuous top bars as needed for special conditions.
Also watch out for short spans next to longer spans where the short span see little or no positive moment.

Check out Eng-Tips Forum's Policies here:
FAQ731-376: Eng-Tips.com Forum Policies

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources