INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

PWHT Requirement

PWHT Requirement

PWHT Requirement

(OP)
We are currently doin a project in which 24" x 18 " pig traps are used. the thickness of major barrel is 12.7 mm and of that of the minor barrrel is 10.9 mm.
and it is designed as per ASME B31.4. DOes the requirement of PWHT applicable.

AS per ASME B31.4, PWHT is applicable only when the wall thickness is more than 32 mm.

Request to Please clarify.

RE: PWHT Requirement

Not required by Code; however, PWHT may be required by the customer. One reason would be Sour Service.

RE: PWHT Requirement

(OP)
Hi Duwe6,
Thanks for the clarification.

The end closure is designed as per ASME Sec VIII Div 1, in that case , will PWHT required?

RE: PWHT Requirement

Per ASME VIII, PWHT is not required for carbon steel (P No.1) less than or equal to 1 1/4 inch thick or up to 1.5" thick when 200F preheat is applied.
Service conditions (lethal or SCC) will dictate otherwise.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources