INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Live Load for Hotel Pool Deck - your thoughts?

Live Load for Hotel Pool Deck - your thoughts?

Live Load for Hotel Pool Deck - your thoughts?

(OP)
Hi all.

We are working on an elevated, outdoor hotel pool deck per 2010 Florida Building Code, using a 2-way slab. The deck is over ground level parking, connects to the hotel lobby, and also has direct egress to the ground. We are having a debate on the appropriate live load, as the Code is not specific. There are a few options which could apply, adn just looking for other opinions as to which you think apply:

1. Balconies and deck = same as occupancy served = 40 psf (hotel) <- im inclined to not use this, since the deck is not directly serving a private hotel room
2. Hotel public rooms = 100 psf
3. Yards and terraces, pedestrian = 100 psf

I'm inclined to go with 100 psf, but using a lower value would be quite helpful, as we have a superimposed dead load of over 100 psf for the finishes.

Thanks.

RE: Live Load for Hotel Pool Deck - your thoughts?

I'd be going with 100psf. Although pools are popular places to party, 100psf of people equates to no room to breath, which is an highly unlikely.

RE: Live Load for Hotel Pool Deck - your thoughts?

I like yards and terraces as the closest analog.

I like to debate structural engineering theory -- a lot. If I challenge you on something, know that I'm doing so because I respect your opinion enough to either change it or adopt it.

RE: Live Load for Hotel Pool Deck - your thoughts?

100 psf for public loading. No brainer.

When I am working on a problem, I never think about beauty but when I have finished, if the solution is not beautiful, I know it is wrong.

-R. Buckminster Fuller

RE: Live Load for Hotel Pool Deck - your thoughts?

Some people might think to gather at the pool in the event of an emergency. That was my rationale.

I like to debate structural engineering theory -- a lot. If I challenge you on something, know that I'm doing so because I respect your opinion enough to either change it or adopt it.

RE: Live Load for Hotel Pool Deck - your thoughts?

(OP)
It's weird, because Chapter 3 defines indoor pools as type A-3 assembly space. But they make no mention of elevated, outdoor pools, rooftop or otherwise.

RE: Live Load for Hotel Pool Deck - your thoughts?

There might be a big crowd there due to a bikini top mishap.

RE: Live Load for Hotel Pool Deck - your thoughts?

Definitely 100 psf + three beers.

Mike McCann, PE, SE (WA)


Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources