INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

CPVC Expansion

CPVC Expansion

CPVC Expansion

(OP)
We are installing a CPVC 13R system it has some straight runs almost 200 feet. Daytime temperatures when we are installing this week range from a high of 65 degrees today to a daytime high of 35 degrees next week. The pipe will eventually be in a controlled environment of 75 degrees. The expansion calculations are based on change in temperature and length of pipe and attached is an easy chart to show the expansion. It shows there will be .04" of expansion for 5' of pipe. Obviously 1/32" of expansion is nothing to be concerned with. What I want to know is, when expansion reaches "X" inches.... then expansion protection is required. Please define "X".

Possibly 1" or 2" is acceptable. Maybe anything more than 3" or 4" of movement needs to be addressed. I understand how to calculate the expansion, and know how to size the loop. What I don't understand is when it is necessary. I have asked the manufacture, they can only say how to calculate the expansion and how to size the loop. No one can tell me at what threshold it is necessary. I could not find anything in NFPA. Any suggestions?

RE: CPVC Expansion

One of my customers had a problem with this. The GC did not insulate per the plan. There was supposed to be a controlled environment, but it did not happen that way. Based on their experience, they figured that the system could generally handle an inch of expansion (when there were drops to ceilings - especially gyp ceilings). The jobs this customer does are typical multi-family with a main in a central corridor and then laterals going to dwelling units. They have requested that we make offsets about every 90'.

I don't think there is any hard and fast rule of when you have to put in the offsets. I think the manufacturers like to keep that from being published as it is less liability for them. But, go with what amount of expansion you think you can handle and place from there. From what I have seen, more than about an inch in hard ceilings can cause issues.

Travis Mack
MFP Design, LLC
www.mfpdesign.com
"Follow" us at https://www.facebook.com/pages/MFP-Design-LLC/9221...

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources