INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Transient Load

Transient Load

Transient Load

(OP)
Should a Transient load (like a blowdown force) considered like a Live load or due to its non-steady condition shall be considered as an earthquake load? It seems too conservative to apply the live load factor (1.6) to a blowdown force for the concrete design. Please advise.

RE: Transient Load

It might seem too conservative, but the difficult nature of calculating this kind of force, plus its impact makes using the 1.6 factor a good idea.
Put it this way, if there's a problem, everyone is going to ask why you didn't use the 1.6 factor.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources