Budgetary costs and schedule for burial of power cables
Budgetary costs and schedule for burial of power cables
(OP)
We are trying put together an initial budget for some alternate energy projects. Does anyone have a "rule of thumb" or SWAG for a budget to install buried 36KV power cables (2/0 conductors) along a major state highway (2 lane plus shoulders). We need to get the power from the alternate energy source back to a connection point on the local distribution grid. I am trying to develop a Rough Order of Magnitude project plan that we can refine as the project progresses.
Regards
Larry
Regards
Larry