INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

QW-407.6 PWHT FOR HFO

QW-407.6 PWHT FOR HFO

QW-407.6 PWHT FOR HFO

(OP)
For a hard-facing PQR on 1 inch thick coupon, per construction code, 1 hour is required for PWHT holding time for the 1 inch thick base material. If per QW-407.6, production component is 4 inch thick, should the PWHT for the PQR Coupon be done in 4 hours (1 hr/inch) for compliance with the QW-407.6 requirement?

Please advise.

RE: QW-407.6 PWHT FOR HFO

My argument would be that the PWHT is for the WELD, which is less than 1-inch thick. And then heat-treat it accordingly; the 1-hour soak in the PQR. Hardfacing is not even similar to a buttweld.

RE: QW-407.6 PWHT FOR HFO

Yes, it should be 4 hours. PWHT Time at Temp is an essential variable for HFO. Requalification is required with a 25% increase of time at temp. You are well over a 25% increase.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources