INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Tower Crane Foundation Design

Tower Crane Foundation Design

Tower Crane Foundation Design

(OP)
Need Help in Designing a tower crane foundation on top of steel H-Pile system: (If some one case suggest a step by step procedure would be great) I'm very occasionally used to designing tower crane foundations resting on compacted earth with known bearing capacity. It is pretty straight forward as the checks are bearing,the overturning with the moment in the diagonal direction, punching shear. However, I need help in determining the foundation size taking into consideration a group of steel H-piles and the approach. Any worked example is greatly appreciated.

Loads from the Crane are as follows: (US Units)

-------------------Overturning Moment----------Horizontal Load-----Vertical Load-----Slewing Torque
Out of Operation--------3932----------------------32-------------------278
In Operation------------5145----------------------10-------------------314---------------587

From the Geotech Report
Bearing 3000PSF

Steel H Piles
----------------------Axial Capacity (Kips)---Uplift (kips)-----Lateral Kips(average based on 24 piles group carrying 282 Kips)
HP 12x53----------------270---------------------80----------------12
HP 14x73----------------370---------------------90----------------12

Output/Trying to calculate

1. Base Size and Working Pile Load (How to calculate)
(Trying to keep the base size to 17' X 17')

2. How to determine the overturning moment vs the resisting moment

3. Distribute the horizontal and the slewing torgue as a lateral load into each steel pile vs lateral capacity of the pile

4. Determine the no. of piles required and the connection of the H-Pile to the Pile cap

Based on the above information and doing some preliminary calculations, it seems the horizontal shear and the slewing torque on the steel H-Pile seems to be the weakest link requiring a decent number of piles.

All inputs are greatly appreciated.

Thanks for your help.

RE: Tower Crane Foundation Design

Please PM me and I will furnish a proposal and contract for services.

RE: Tower Crane Foundation Design

Hopefully not too late. Derricks and Cranes by Shapiro should help. There is a whole section on tower cranes.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources