Jetting Pilings into the River Bottom Hard Pan
Jetting Pilings into the River Bottom Hard Pan
(OP)
We will be jetting 10"dia. pilings into the riverbottom to support a pier. Hard pan (hard packed sand) is about 18 to 20 foot deep. How far into the hard pan should the pilings be set?




