INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Vapor Belt Distributor & Mandatory Appendix 14

Vapor Belt Distributor & Mandatory Appendix 14

Vapor Belt Distributor & Mandatory Appendix 14

(OP)
All,

I have been asked to evaluate an existing heat exchanger (condenser) with Vapor Belt Distributor. I have used the COMPRESS software's calculations for Integral Flat Heads with a Large, single, circular, centrally located opening (Mandatory Appendix 14) capability. Due to the method of fabrication (full penetration corner welds), Mandatory Appendix 5 and Mandatory Appendix 9 are NOT applicable.

The results are very poor. The vessel would need to be down rated according to the results. Has anyone come across this issue in the past?

Thanks,

Eddy

RE: Vapor Belt Distributor & Mandatory Appendix 14

The code has some specific requirements on how to handle vapor belts, see paragraph UHX-4(c). How you handle it depends on whether any of the internal shell remains in the area of the vapor belt.

Have you considered this paragraph already?

RE: Vapor Belt Distributor & Mandatory Appendix 14

(OP)
Yes. I have considered this paragraph. It led me astray. I don't think that I could use the guidance provided since it assumes vapor belt or flanged and flued expansion joint connections. These appendices do not apply to the current method of fabrication (full penetration corner welds).

RE: Vapor Belt Distributor & Mandatory Appendix 14

The results are unsurprising. Square corners calculate to a low MAWP. Without some shell remaining under the belt, that MAWP will be tiny. Eddy1998 is telling you to investigate to see if there is some shell that is under the bolt. You need to stuff someone inside that shell to see if the shell continues on through the vapor belt, and how many and how big the 'windows' are that were cut in the shell to allow the vapor to enter the shell.

RE: Vapor Belt Distributor & Mandatory Appendix 14

If you do not have any remaining shell under the vapor belt, and you have a square built-up vapor belt, then as you say the code doesn't directly cover this geometry.

You could invoke good-ole U-2(g) in this case and refer to TEMA for a design basis. TEMA paragraph RCB-8 (Flexible Shell Elements) does cover the geometry of square corners, and gives a full design basis. Note that the latest edition of TEMA (Ninth) has switched to an FEA based calculation method.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources