INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ASME B31.3 PWHT requirements for P No.5A

ASME B31.3 PWHT requirements for P No.5A

ASME B31.3 PWHT requirements for P No.5A

(OP)
ASME B31.3 requirements for heat treatment nominal wall thickness below 13mm.

preheat minimum 175 degrees C but PWHT is not required

The above requirements are different to those stated in ASME B31.1 which require PWHT 675 - 760 degrees C and ASME VIII which require PWHT 675 degrees C

From the above info i do not have to PWHT to comply with ASME B31.3 - but have i missed something as i would have thought PWHT would be required?

any advice greatly appreciated

RE: ASME B31.3 PWHT requirements for P No.5A

IF B31.3 is your design code, and the code does not spell out PWHT requirement, youre not required to do.
The scope of (and piping applications in) B31.1 and B31.3 are different, hence theyre requirements are different.

Do not forget to check if your contract spells out PWHT requirement,s e.g. by means of client specifications.

RE: ASME B31.3 PWHT requirements for P No.5A

B31.1 2010 Edition, PWHT requirements for P-5A

PWHT is not mandatory for P-No. 5A material under the following conditions:
(a) welds in pipe or attachment welds to pipe complying with all of the following conditions:
(1) a nominal material thickness of 1⁄2 in. (13.0 mm) or less
(2) a specified carbon content of the material to be welded of 0.15% or less

PWHT temperature range is 700-760 deg C.

For B31.3 P-No 5A material, PWHT temperature is 704-760 deg C for thickness greater than 13mm.


Each ASME B&PV code book committee and ASME Piping Code committee is a standards committee of it's own that can make rules applicable to their standard based on safe experience.

RE: ASME B31.3 PWHT requirements for P No.5A

(OP)
thanks for the help guys

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources