INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Duration of Load Adjustmen Factor for Lumber in formwork application

Duration of Load Adjustmen Factor for Lumber in formwork application

Duration of Load Adjustmen Factor for Lumber in formwork application

(OP)
Is it permissible/common to interpolate the CD duration of load factors?

Application is vertical and horizontal lumber (soldiers/walers) for 5' high concrete wall forms, with the 1-minute factor of 1.6 vs 7 day factor of 1.25.

Can I use 1.4 or 1.5 given load duration is less than 24 hours (wet plastic concrete form pressures)?

RE: Duration of Load Adjustmen Factor for Lumber in formwork application

This thread may be helpful: Link

I like to debate structural engineering theory -- a lot. If I challenge you on something, know that I'm doing so because I respect your opinion enough to either change it or adopt it.

RE: Duration of Load Adjustmen Factor for Lumber in formwork application

Quote (Ingenuity)

Is it permissible/common to interpolate the CD duration of load factors?

Technically, yes, but not by interpolation. The duration factor is governed by this equation:

Cd = 1.75192 / (DOL) ^ 0.04635 + 0.29575

Where Cd = Load Duration Factor
DOL = Duration of Load (Seconds)

The values for 24 hours, 1 week, 1 month, etc. are just points on that curve.

Load duration factor, as we know it, evolved over many years. It became the form we use today in NDS 1951. This is explained in the 1997 NDS Commentary, see page 8:

http://www.awc.org/pdf/NDSCommentaryCompressed/Par...

The 1951 Forest Products Lab paper that reported on experiments used to derive the equation is here:

http://www.fpl.fs.fed.us/documnts/fplmisc/rpt1916....

Just for fun, I solved the equation for a 6 hour duration and got Cd = 1.40
Note: Also got essentially the same answer when I used my log-log slide rule to if I still knew how to us it for exponentials. smile

Of course the above is the technical answer. Whether this would be interpreted as meeting any specific code is another question.

www.SlideRuleEra.net idea
www.VacuumTubeEra.net r2d2

RE: Duration of Load Adjustmen Factor for Lumber in formwork application

(OP)
Thank you, KootK and SRE,

Good thread link and great references.

Thanks.

RE: Duration of Load Adjustmen Factor for Lumber in formwork application

Better watch your deflections though as the load duration factor should not be used. Will give a waviness to the wall if deflects too much.

Mike McCann, PE, SE (WA)


RE: Duration of Load Adjustmen Factor for Lumber in formwork application

(OP)
Thanks, Mike. Will do.

I am going through an exercise of varying soldier and waler (and through-tie) spacings for a given section size and species...and comparing costs.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.