INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Cladding vs Overlay for Sour Service

Cladding vs Overlay for Sour Service

Cladding vs Overlay for Sour Service

(OP)
1)Do we need NACE compliance for carbon steel if cladded with 625 or 825 ?

2)and do we need NACE compliance for parent metal for weld overlay ?

3) I believe, we need compliance for weldoverlay and not cladding .. Why ?

Also for HDPE lining, why do we need NACE for base material ?

RE: Cladding vs Overlay for Sour Service

1) Yes (according to NACE MR0175). Also the weld/overlay HAZ must comply with the standard.

2) This is question 1 reworded. Still a yes.

The reason is in case the cladding or lining integrity is compromised, you don't want your base metal cracking.

RE: Cladding vs Overlay for Sour Service

1) It's not a strict 'Yes' - there is an out if the end user can 'document' the reliability of the overlay or cladding

2) See 1

3) Compliance = compliance for the overlay, cladding or substrate? The question is not clear.

HDPE liners can permeate acid gases and water vapour, thus the corrosion process can occur at the metallic pipe surface

Steve Jones
Corrosion Management Consultant

http://www.linkedin.com/pub/8/83b/b04

All answers are personal opinions only and are in no way connected with any employer.

RE: Cladding vs Overlay for Sour Service

(OP)
I am talking about parent metal.. Do we need HIC testing and NACE compliance ?

RE: Cladding vs Overlay for Sour Service

The short answer is yes, the parent material must be NACE compliant. The overlay HAZ, which is also within the parent material, must comply as well. As SJones pointed out, there is a clause that allows one to use their "documented" reliability of the overlay to use parent material that doesn't comply with the standard.

RE: Cladding vs Overlay for Sour Service

in this case, parent metal need to be SSC tested or SSC resistant quality plate is required, but HIC tested is not required.

RE: Cladding vs Overlay for Sour Service

(OP)
@KMur: Do u mean that SSC s required and HIC is not required for both cladding and Weldoverly ?

Thanks..

RE: Cladding vs Overlay for Sour Service

Yes nickypaliwal.
SSC is required. HIC is not required.

RE: Cladding vs Overlay for Sour Service

(OP)
Thanks for clearance.. Why is HIC not required ? Is HIC required for parent metal in case of Non-metallic coating also ??

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources