INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

installing valves for n.g pipelines, before or after hyd. test?

installing valves for n.g pipelines, before or after hyd. test?

installing valves for n.g pipelines, before or after hyd. test?

(OP)
Dear friends,

I heard from some engineers, that, conducting hyd. static test on pipeline; must be before installing secion valve rooms,especially for natural gas and crude oil pipelines, to keep valves safely from dust and impurities. is that true or what
thank you in advance.

RE: installing valves for n.g pipelines, before or after hyd. test?

There's no such thing as"must" when it comes to these things. If the valves are flanged then I've seen it done, but so long a you open the valves fully and don't close them until the test fluid is flushed out there should be no real issue. The valves well be exposed to dirt in their working lives so a bit at the start isn't fatal. If the valves are welded then you end up with too many untested welds.

There is a lot of rubbish talked about what you must and must not do during hydrotestingg but most of this is simply custom and practice of the individual or company. The only thing you need to do is follow the code requirements.

My motto: Learn something new every day

Also: There's usually a good reason why everyone does it that way

RE: installing valves for n.g pipelines, before or after hyd. test?

We test with the valves installed, 1/4 open. This allows for equal pressure around all surfaces of the ball and seal to prevent damage.

RE: installing valves for n.g pipelines, before or after hyd. test?

That's OK if you absolutely must test it when installed, but not ideal, as it might allow dirt to get around and into the sealing regions on some valves. Keep the water clean.


Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources