INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Roof Loads for a Pre-engineered bldg

Roof Loads for a Pre-engineered bldg

Roof Loads for a Pre-engineered bldg

(OP)
May I ask if anyone knows what are typical values for Roof Live Load, Roof Dead Load and Roof Collateral Load for a pre-engineered bld?
Any source or code that these numbers come from?

Thank you

RE: Roof Loads for a Pre-engineered bldg

From where i am at, its about 8-10 psf dl, and about 20 psf ll. It all depends on the spec for the roofing type, additional dead load. the live load is usually snow load, or min live load.

Check IBC

RE: Roof Loads for a Pre-engineered bldg

(OP)
JAE (Structural),
It's located in US.

RE: Roof Loads for a Pre-engineered bldg

Depending on your region, DL could be as low as 3 psf, LL could be 20 psf (reducible) and collateral load is up to the owner based on their needs.
LL is code based. The rest is project specific.

RE: Roof Loads for a Pre-engineered bldg

Hawfaz is correct about DL and LL. The loading for these buildings is no different than a conventional steel building. They are just have lighter framing but the same environmental loads.

RE: Roof Loads for a Pre-engineered bldg

(OP)
hawkaz (Structural),
Thank you for your reply I guess it was clear and straigthforward answer.
Thanks

RE: Roof Loads for a Pre-engineered bldg

Metal buildings are typically designed to be as cheap as humanly possible. The manufacturers will, unless told to do otherwise by the EOR, will design them for actual roof dead loads with no collateral load and L/90 for wall framing. I even had one recently where they designed it for a 12 psf roof live load and specified special scaffolding was required for workers on the roof.
So be careful when specifying them.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources