INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

NRCS Lag

NRCS Lag

NRCS Lag

(OP)
What are the limitations of the NRCS Lag method for determining Tc? I know there is a range for the CNs used (50 to 95) but are there any risks to using this method with very small watersheds or using this Tc in the Rational Method?

RE: NRCS Lag

I suggest that you review NEH Chapter 15, which is the authoritative reference on SCS Tc procedures. It states in part:

Applications and limitations
The watershed lag equation was developed using data from 24 watersheds ranging in size from 1.3 acres to 9.2 square miles, with
the majority of the watersheds being less than 2,000 acres in size (Mockus 1961). Folmar and Miller (2000) revisited the development of this equation using additional watershed data and found that a reasonable upper limit may be as much as 19 square miles.

Peter Smart
HydroCAD Software
www.hydrocad.net

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources