INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Jobs

Deadman anchor - Wall friction

Deadman anchor - Wall friction

(OP)
Hi,

Another wall friction question.

Currently designing an anchor tie back system, due to the high tie force the original option of a 'balanced' sheet pile anchor is not possible, the anchor rod must be above water level so the balanced option is just not feasible.

I'm now looking at a 'cantilever' combi-wall sheet piled option for the tieback anchor. All the technical material/resources/codes I have seem to go into very little detail on deadman design, and most of them either don't mention the cantilever option, or they have hardly any guidance on it.

With regards to wall friction angle, most of the guidance I have either didn't mention wall friction, or they said to ignore it, but didn't say why. One (only one) of the sources said that for a deadman anchor wall friction must be ignored because there isn't sufficient 'vertical restraint'. But I presume this is referring to a relatively shallow 'balanced' option. My system is probably going to be around 10m deep. Thus I suspect wall friction would act as the anchor design is now similar to a conventional cantilever sheet pile design.

I was thinking of taking 0.5PHi, I think this is reasonable (as opposed to 0.67PHi???

RE: Deadman anchor - Wall friction

Could you provide us a sketch of your problem?

RE: Deadman anchor - Wall friction

I am totally confused by your posting. Also, what is your question? A sketch might help, as avscorreia mentioned.

www.PeirceEngineering.com

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close