INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Transferring Diaphragm Forces

Transferring Diaphragm Forces

Transferring Diaphragm Forces

(OP)
What is the best way to transfer flexible diaphragm forces at re-entrant corners between shear walls? I have some ideas, but I wanted to get some more. To get a sense of the loading, it is about 350# per foot of seismic and 125# per foot of wind (includes windward and leeward).

I am more concerned about the wind load transfer as it seems to me that the seismic load is generated through the mass of the building and doesn't (in my opinion) need to be transferred across the re-entrant corner.

Thank you.

RE: Transferring Diaphragm Forces

If the forces are not too big, I have used a continuous single angle notched at each joist. But, a single angle won't be enough if the demand is Ω0 x 350 plf x 512'. Has the diaphragm been analyzed to determine the collector demand.

RE: Transferring Diaphragm Forces

Normally, I'd say an EW drag strut coming off of the corner. I favour a C8 laid flat as it guarantees overlap with the deck trough.

Is it correct to assume that all of your walls are shear walls? If so, I think that you could make a pretty good case for doing nothing at all.

The greatest trick that bond stress ever pulled was convincing the world it didn't exist.

RE: Transferring Diaphragm Forces

(OP)
I have not analyzed the proposed collector. It will obviously be more since it is at an angle.

All the walls are shear walls except the "little" segment running north-south on the page. Yeah, was thinking about just extending the 36-7 fusion weld pattern to cover this area, but not adding a collector element.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources