INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

NETA Testing for Temporary Equipment

NETA Testing for Temporary Equipment

NETA Testing for Temporary Equipment

(OP)
Good morning.

I am not an electrical engineer, but am a mechanical engineer working as a consultant on a project that includes a substantial amount of electrical upgrades. Some of these upgrades necessitate the installation of temporary equipment due to the phasing requirements associated with replacing components (transformers, switch gears, etc.) that serve existing-to-remain systems.

The specifications require NETA testing for many of these systems but do not explicitly specify whether this testing is required only for permanent systems or is also required for temporary systems.

Is NETA testing typically required for temporary systems?

Thanks!

Rob

RE: NETA Testing for Temporary Equipment

Only if you want to make sure it doesn't blow up when energized.

However, the extent of the tests may be reduced. Without knowing the age of the equipment, the voltage, the cost of an outage to the loads, and many other factors, it is difficult to say which tests are not needed.

RE: NETA Testing for Temporary Equipment

Roba2686,

There is no deterministic answer to your problem

However, you can make an engineering judgement considering the expected level of reliability using temporary equipment taking in consideration the following factors:
1) How critical is the temp equipment of the event of a fault.
2) Aging and conditions of the equipment. As older the equipment additional test and condition assessment may be required to determine the actual conditions.
3) cost of the test vs. consequence of a failure. That could justify the testing and commissioning budget
4) Redundancy of installation. Primary and backup
5) Availability of spare equipment in the event of failure
6) Duration of the temporary installation.

Take in consideration that if you move equipment, some part may be disassemble and there are uncertainty if the equipment deteriorate during rigging or transportation. One way to understand the actual condition is performing test to validate if the equipment is in suitable conditions to be energized.

RE: NETA Testing for Temporary Equipment

Any equipment Temporary or Permanent needs to be verified before use and extent of verification depends upon its application and function. A light Switch can just be visually checked but a motor may have to be meggared before it is put to use.
Thanks.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources