×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

earthquake engineering of tunnels close to ground surface

earthquake engineering of tunnels close to ground surface

earthquake engineering of tunnels close to ground surface

(OP)
From what I know, there's two distinct methods of designing for earthquake resistance, one for underground structures and one for above-ground structures.

For underground structures you look at the soil displacement during the earthquake and assume that the soil "imposes" the displacement on the underground structure and the underground structure, depending on its rigidity will resist it, with corresponding actions (shear forces/bending moments/etc...).

For above-ground structures, you look at the inertia of the structure and the structural period to judge the design actions, using the design spectra.

Now I'm designing for a tunnel that is transitioning from underground (~10m below ground surface) to aboveground (at ground surface). What is the boundary between treating it as an above ground structure or as an underground structure? And what method should I use to assess the differential settlements between the aboveground/underground connection if that has to be designed for?

RE: earthquake engineering of tunnels close to ground surface

Design for underground movement the whole way. Keep it consistent!!!!! If you don't -> You WILL get errors that will cause it to fail. (An "error" will never go "stronger" - only "weaker" ... )

Design "above ground" only for those areas where the "tunnel" is raised above grade and suspended on bridge piers or between abutments.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources