INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

woodward 505 extraction control

woodward 505 extraction control

woodward 505 extraction control

(OP)
maybe some of you can help to setup a 505 extraction parameters:

Piping configuration the inlet to the turbine is 300#, and also feeds a letdown station, the letdown station is tied with the extraction pipe so basically the letdown valve and the extraction are in parallel.

Old System

The old system consisted in a non-condensing turbine, a 4-20 MA signal was provided to the 505 to control the 145 pressure using a master pressure signal that in cascade would act as a split range controller, in cascade the signal from 0-29% was provided the turbine control for the 145 PSI header pressure, the rest 29-100% signal was provided to a letdown valve.

Master Pressure signal 0-100% in cascade this signal is for the Woodward 505 goes through a function generator and converts the 0-29% to 0-100% feed as a set-point to auto manual station (0-100% output), likewise the rest 29-100% is re-scaled to 0-100% and feed as a set-point to auto manual station for the letdown station.

New system

The new system is a condensing turbine with extraction control currently it is configured to control the 145 pressure by a pressure transmitter as the process variable and a local set-point via the 505. I think that two pressure controller (let down valve and the extraction control) will not play together nice since there is the possibility that one will take over. I am having problem how to implement the signal from the pressure master to the Woodward 505 any suggestion on the 505 extraction setting to allow a plant master signal to control extraction?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.