INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

UT in lieu of RT

UT in lieu of RT

UT in lieu of RT

(OP)
On shell long seams for Section VIII Div. 1 does the Phased Array technique for UT HAVE to be used in lieu of RT, or can shear wave be utilized.

RE: UT in lieu of RT

Please read UW-53 and Mandatory Appendix 12.

RE: UT in lieu of RT

(OP)
I have read both several times. Along with Section V Article 4. It doesnt't say anything about Phased Array, unless I'm to assume that all of the NDE terminology they use means Phased Array.

RE: UT in lieu of RT

No, shear wave UT is still around and used often.

RE: UT in lieu of RT

Phased Array is a form of Shear Wave UT which utilises many different angles of Shear in a 'Phased Array'.

The results give a graphical illustration through the weld in many formats, A, B, C & D Scan.

It is semi mechanised and can be fully mechanised, you get a set of results which include a Datum so re-scanning the same weld days/months/years later gives very accurate monitoring of any defects noted.

PA is slowly catching on in the North Sea Oil & Gas Industry.

RE: UT in lieu of RT

Hold on guys,
the OP asked about UT in lieu of RT for Div 1 work. See CC 2235. It's very involved and expensive. Trust me on this I've been through it several times. I'm not saying don't do it b ut I am saying understand the requirements before you decide.

RE: UT in lieu of RT

Code Case 2235 is no longer applicable to ASME Section VIII. These requirements are now addressed in UW-51(a)(4) of Div. 1 and paragraph 7.5.5 of Div. 2.

RE: UT in lieu of RT

(OP)
So what is the answer? If UT is used in lieu of RT must it be PHASED ARRAY? UW 51 and paragraph 7.5.5 are not really clear to me. Difficult to understand.

RE: UT in lieu of RT

Hi,

CC2235 was incorporated in ASME VIII/1 Edition 2010 Addenda 2011 with a reference to the applicable paragraph of ASME VIII/2, 7.5.5.

This paragraph referenced ASME Section V Article4 including Appendix VIII and IX. Therefore in addition to the requirements of Table T-421 the requirements of and Table VIII-421 shall apply.

That means either Phased Array or Time-of-Flight-Diffraction (TOFD) UT are permissible as long as the Scanning technique is automated (AUT) or semi-automated (SAUT).

In addition please find below two Interpretations to CC2235:

Interpretation: VIII-1-98-41
Subject: Section VIII, Divisions 1 and 2 (1998 Edition); Code Case 2235
Date Issued: September 4, 1998
File: BC98-327
Question: Is it permissible to use the Ultrasonic Time-of-Flight-Diffraction (TOFD) Technique when implementing Code Case 2235?
Reply: Yes.


Interpretation: VIII-1-07-68
Subject: Code Case 2235-9
Date Issued: January 5, 2009
File: 08-1260
Question (1): Does Code Case 2235-9 require an ultrasonic examination plan capable of detecting indications transverse as well as parallel to the weld centerline?
Reply (1): Yes.
Question (2): Are the acceptance criteria specified in Tables 1, 2, and 3 of Code Case 2235-9 applicable to indications oriented transverse as well as parallel to the weld centerline?
Reply (2): Yes. Per para. (c), the ultrasonic examination shall be performed in accordance with a written procedure conforming to the requirements of Section V, Article 4. T-472 of Section V, Article 4 identifies examination requirements when using the Distance Amplitude Technique, such as Linear Phased Array ultrasonics, and T-474 covers Non-Distance-Amplitude Techniques. From T-472, weld joints shall be scanned

Regards - Juergen

RE: UT in lieu of RT

Excellent explanation!

RE: UT in lieu of RT

Fleischfresser,
Thanks for pointing out the fact that the CC has now been incorporated into Sec VIII Div 1. My point is that prior to electing to use the option of UT in lieu of RT the fabricator would be wise to familiarize themselves with all of the requirements including, as you have pointed out, ASME V Art 4 and the applicable appendices. Just the demonstration and calibration blocks are involved and costly. One cannot simply replace RT with shear wave UT evaluated to App 12. I've been through several Div 1 and Div 2 projects using UT and its been, ... interesting.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources