×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

NACE SP0403 and Fittings

NACE SP0403 and Fittings

NACE SP0403 and Fittings

(OP)
I need help! My client is requesting we supply fitting that meet with NACE SP0403. We supply fitings that meet with NACE MR0103 and/or MR0175. My question is - Does SP0403 apply to fittings? or Does it apply to the construction of the project? Your help is greatly appreciated!

RE: NACE SP0403 and Fittings

NACE RP 0403 (SP0403) is for Avoiding Caustic Stress Corrosion Cracking of Carbon Steel Refinery Equipment and Piping

Does SP0403 apply to fittings?
If the fitting is going to be used in Caustic service and if the contract that you entered says that NACE RP/SP 0403 is applicable for a given item, then it is applicable.

or Does it apply to the construction of the project?

If the fitting is going to be used in piping construction and that piping is in Caustic service and if the contract that you entered says that NACE RP/SP 0403 is applicable for a given item, then it is applicable.

May a fitting meeting the requiremetn of NACE MR 0175/ISO 15156 be classified as complying to SP0403

Material selection is not in the scope of fitting manufacturer. That is, it is the responsibility of the purchaser to know where the fitting is going to be used. If it is going to be used in region "C" he should not order carbon steel fitting.

Assuming the purchaser orders CS fitting then one has to infer that the purchaser is fully aware where the fitting is going to be used, the obligation of the supplier is as following

For Carbon steel fitting seamless:: it may be as per ASTM

If the item is Welded fitting, then the fitting shall be heat treated after welding and such heat treatment shall be such that the minimum soaking temperature shall be minimun 635 deg c. Normalized and Q & tempered fitting automatically qualifies

The fitting should be given WFMT (SP0403 is not clear whether this is required for weld only or for material, hence it is better to perform for the full fitting)

Also it is recommended that UST of the fitting body be conducted (again SP0403 is not clear whether this is required for weld only or for material, hence it is better to perform for the full fitting)


The above are based on old RP0403-2003 version of NACE, i do not know what the current version says

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources