INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

BIDDING PROCESS NOT BASED ON THE LOWEST BID BUT ON THE QUALIFICATION OF THE VENDOR

BIDDING PROCESS NOT BASED ON THE LOWEST BID BUT ON THE QUALIFICATION OF THE VENDOR

BIDDING PROCESS NOT BASED ON THE LOWEST BID BUT ON THE QUALIFICATION OF THE VENDOR

(OP)
Hello,

I was wondering what would be the main criteria for selecting a vendor for a GSU Transformer of a hydropower plant.The specification writing for this transformer is almost complete and would be going to the bid soon. The bidding process will not be based on lowest bidder but rather on the qualification of the vendor?

Any suggestions would be highly apreciated.

SG

RE: BIDDING PROCESS NOT BASED ON THE LOWEST BID BUT ON THE QUALIFICATION OF THE VENDOR

You should determine the present value cost of losses and use that in the evaluation. Put the cost per kW of load losses, no-load losses, and auxiliary losses in the specs and say that the award will be based on the bid price plus the cost of losses. Do not solicit bids from unqualified vendors. Also include something to the effect that the owner reserves the right to accept the proposal which, in its judgment, is the best and most responsive proposal; to reject any and all proposals; and waive irregularities and informalities in any proposal that is submitted.

RE: BIDDING PROCESS NOT BASED ON THE LOWEST BID BUT ON THE QUALIFICATION OF THE VENDOR

Check whether your tendering process is governed by any special local laws (for instance, public bodies within the European Union are legally bound to follow a constrained set of procurement processes that don't apply to the rest of the economy).

A.

RE: BIDDING PROCESS NOT BASED ON THE LOWEST BID BUT ON THE QUALIFICATION OF THE VENDOR

The best document for evaluation of capability of Transformer vendors is CIGRE Technical Report No 530-2013 Guide for conducting factory capability assessment of Power Transformers. Similar CIGRE documents on the subject are Report No.529 Design Review and No 528 Guide for preparation of Transformer Specifications.You can get these from www.e-cigre.org

The attached link will take you to a manual dealing with transformer specifications and procurement procedures.http://ieema.org/Contents/Services/Service_Show.as... – IEEMA 25-2014: Power Transformer Standardisation Manual

On Transformer loss capitalisation and life time cost etc USBR document is the best -http://www.usda.gov/rus/electric/bulletins.htm - USDA Rural development bulletins
&publications.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources