INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

hydro fracturing

hydro fracturing

hydro fracturing

(OP)
Currently "Contact Grouting" around and existing tunnel 60-100 ft deep at pressures equal to 1 psi per vertical foot with a high mobility grout. Grout is surfacing with little indication that grout is around the tunnel. Tunnel was installed in the 60's.Soils range from medium to stiff clays and silt. We are installing six packers every 10 feet-packers are at the 1,3,5,7,9 and 11 clock positions. Are we experienceing "hydro fracturing" of soils?

RE: hydro fracturing

If you are hydrofraccing , you have a major problem. Your grouting records need to be meticulous .... you cannot rely on records provided by the grouting crew. Suggest you get knowledgeable personnel involved asap.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources