INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

shear keys in foundations

shear keys in foundations

shear keys in foundations

(OP)

I'm to design a foundation and the structural engineer shows 200x80x25thk member as shear key inside the plinth, but when I checked the bolts and plinth and foundation for the loadings given to me I see that I don't have to provide the shear key... Is the shear key important to put if the concrete design is fine or I still need to provide it for his steel column ?

RE: shear keys in foundations

Ask the structural engineer, not people on the internet.

RE: shear keys in foundations

Seconded. You can't not include something without a blessing from the engineer. Maybe it's a redundancy in his design.

RE: shear keys in foundations

I've seen "shear keys" installed to inhibit water leakage, similar to a very crude waterstop. I've also seen drafters show them just because they were taught that's what a cold joint is supposed to look like.

Bob

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources