INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Diaphragrm Wall

Diaphragrm Wall

Diaphragrm Wall

(OP)
Is it possible when using a permanent diaphragm wall to retain soil and as a basement wall, can columns from the superstructure be place on top of the diaphragm wall to support the building load?

RE: Diaphragrm Wall

In short: yes. As long as you've you've covered your bases in terms of engineering and durability, you can do pretty much anything. That being said, what you've proposed is rare and it deserves careful study. You'll need a durable and convincing load path for both vertical and lateral loads.

I asked a related question previously that may be of interest to you: Link.

The greatest trick that bond stress ever pulled was convincing the world it didn't exist.

RE: Diaphragrm Wall

I have done a couple. You need to make sure you have the soil capacity at the base for the superstructure loads, and of course the structural capacity in the wall itself. Also the ones I have done always have the center line of the wall eccentric to the superstructure columns so I had to provide cap beams to transfer the load back into the wall. But can and is done without too much trouble

RE: Diaphragrm Wall

(OP)
What type of retaining wall would be recommended for partial basement on a slope land with a high water-table and also have neighboring building next to it ?

RE: Diaphragrm Wall

@stattik: how close to the property line are you?

@Dcarr: how does one get the membrane etc on the exterior of the diaphragm wall in this situation? Segmental blind side of some sort?

The greatest trick that bond stress ever pulled was convincing the world it didn't exist.

RE: Diaphragrm Wall

The wall itself does 98% of the work keeping the water out. On a couple of Projects (40 to 50ft deep with about 25ft of head above bottom of cut) we had a low capacity drainage system on the inside face of the wall. There was the diaphragm wall then waterproofing/drainage and then an interior finish wall. Works well except for the end of one floor where the contractor forgot the waterproofing/drainage. In that place some water gets to the interior but it is a parking garage so the owner didn't mind.

RE: Diaphragrm Wall

Neat. Is there always an interior finish wall? Is that concrete or something lighter?

The greatest trick that bond stress ever pulled was convincing the world it didn't exist.

RE: Diaphragrm Wall

Intereior wall is typically Shotcrete. The walls were not truly diaphragm walls, but secant piers walls.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources