INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Flow Requred for Hot Tapping

Flow Requred for Hot Tapping

Flow Requred for Hot Tapping

(OP)
Welding a 4" WOL on a std wt 10" live fuel line. The fuel is gasoline. This line runs from a tank farm some miles away to a port. We are sure the line is completely purged of all air. It would be very difficult to have any flow during the operation.

Must there be a minimum flow to weld the WOL on? API-2201 is a little vague. Elsewhere I have read that you can do this with no flow on a case by case basis.

My thoughts are to weld one pass at a time. The far end of the mainline at the tank farm is open to the tank which is vented - so over pressure due to thermal expansion is not an issue.

RE: Flow Requred for Hot Tapping

Minimum flow should be enough to carry off any added heat.
Empty the tank and fill it during the hot tap.
Let your contractor worry about these things.

you must get smarter than the software you're using.

RE: Flow Requred for Hot Tapping

(OP)
There is no where to empty the tank unless I rent something to put at the dock end.

RE: Flow Requred for Hot Tapping

If there is nowhere to empty the tank, it's too hard for me to understand why you filled it.

Why not rent something to put at the beginning of the pipeline, pump it from the tank at hot tapping minimum flow rate to there. The hot tap won't care which way the flow goes.

you must get smarter than the software you're using.

RE: Flow Requred for Hot Tapping

There is only pressure limitation during the hot tapping. The sealing system of hot tap valve is weakening the metal around.
Talk to the hot tap valve supplier for their limitation on the pressure for the hot tapping operation.

Hope it helps.

RE: Flow Requred for Hot Tapping

If it was mine, I would open all valves between the O'let and the tank, and [as usual for Hot Taps] slowly weld on the O'let, using E7018 3/32". Probably would have the welder keep the root and hotpass beads short - only burn about half of the rod, then let everything cool. Getting a decent flow will be impractical, UNLESS you could time the welding with the loadout of gasoline. In that case, just weld it up and try to get done before the loadout stops.

RE: Flow Requred for Hot Tapping

You need to put some thought into what you are doing with this hot tap. Hot tapping is a dangerous operation. Time your tank fill/empty to accommodate the tapping. You could also use a nitrogen purge to give the cooling flow. Maybe fill that section of piping with water to eliminate the flammability.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources