INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ASME Sec. VIII 2013 Div. 1 Repairs question

ASME Sec. VIII 2013 Div. 1 Repairs question

ASME Sec. VIII 2013 Div. 1 Repairs question

(OP)
I am trying to figure out if there is a limit on repairs of a weld joint before the HAZ needs to be cut out. Currently we repair a part for a customer about once a year and we continually have done this on that part about 8 times. Neither UG-78 or UW-38 cover anything on this so im stuck and would like input from the experts. Thanks in advance.

RE: ASME Sec. VIII 2013 Div. 1 Repairs question

This would not be covered by ASME Section VIII, Division 1, because it is a Code of Construction. You would need to refer to one of the repair and testing standards.

RE: ASME Sec. VIII 2013 Div. 1 Repairs question

(OP)
If the code book used for repairs is the Nation Board Inspection Code part 3 and it doesnt mention anywhere in the code removal of Heat affected zones after so many welding repairs then it shouldn't be an issue regarding how many times a joint has been repaired?

RE: ASME Sec. VIII 2013 Div. 1 Repairs question

As stated in the forwards / introductions to the various codes... One still needs to use good engineering jugement. As TGS4 points out, VIII-1 won't cover a post-construction issue. If you aren't finding direct guidance in NBIC then you must use your jugement. It sounds as though you are concerned, which shows that you are not just following the rules but are thinking about what you are doing. This is a good start.

Making a decision would require getting some materials engineers involved to evaluate how the welding which has been historically performed may have impacted the steel's properties. You might start with some hardness testing to get some feel for how this material is currently behaving.

RE: ASME Sec. VIII 2013 Div. 1 Repairs question

Quote:

I am trying to figure out if there is a limit on repairs of a weld joint before the HAZ needs to be cut out.

As mentioned above, repairs during post construction (in service) would fall either under the NBIC or API 510 for guidance. Regarding this specific question, repairs on certain materials, like carbon steel, can be repaired an unlimited number of times IF the material is not impact qualified with PWHT. If the material is impact qualified along with the WPS (weld and HAZ), the number of times for repair is dictated by the aggregate time qualified for production PWHT.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources