INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Multi-Bed Ion-Exchange Column: Design of internal screens for installation/removal

Multi-Bed Ion-Exchange Column: Design of internal screens for installation/removal

Multi-Bed Ion-Exchange Column: Design of internal screens for installation/removal

(OP)
A three-level, packed bed, ion exchange column, approx. 7’ OD x 20’ tall, ambient water, 100 psi MWP is the subject, link to sketch attached. It will have three IX resin beds, each separated from the other by a disk of wedge-wire screen with 0.009” slots. The disks will be segmented for removal through the access flanges and will be supported by some sort of structural framework. Two access flanges, one in upper head, one in the shell of the bottom compartment. Height of each bed compartment is approx. 6’ and the disks would probably be transversely sliced into four strips, with the longer pair in the center sliced in half; something like that so they could be tilted and maneuvered for installation/removal.

The question: If you were specifying how the three screen plates would be installed or removed, which affects the design details, would you recommend working from top to bottom, or bottom to top.

1) Work from bottom to top on scaffolding; enter @ bottom, remove floor screen, erect first level of scaffolding, remove screen 6’ above, add scaffolding, raise/lower material via pulley, etc., or
2) Work from top to bottom on ladder; enter @ top, slip ladder in, remove most of the upper screen about 6’ below entry point, extend the ladder downwards, remove the next and work your way down.

This is not my area of expertise but I don’t gravitate towards the top down approach. I doubt there will be any sort of work platform on the column (is that legal?), slipping a ladder into the upper access flange seems tricky, climbing each section up and out on the ladder isn’t something I’d want to do, and if someone gets injured before there is any access to the lower access flange it would be pretty difficult to get them out.

Working from below is counter intuitive to my colleagues but I see it as pretty straightforward, particularly with the relatively small size of the screened segments. Small jacks could be used if necessary to initially dislodge the screens and once into the upper reaches, a pulley system off of the scaffolding could be used to raise/lower material. I’d rather work from a scaffold, the lower access flange would always be available for injured person extraction.

What do you all think?

Thanks for any assistance.

RE: Multi-Bed Ion-Exchange Column: Design of internal screens for installation/removal

Like a lot of things, reinventing something that has been proven to work is a terrible idea, *unless* you have a brilliant insight. Lacking that, stay with 'Tried & True'.

Segmented trays that fit through the manway work. Building and filling a column from the bottom up, and cleaning one from the top down works. For safety, there are wire-rope retractable lanyards up to 100-ft long. [maybe more]. The workers would be thankful for a welded tie-off lug just above the manway(s), on the inside so that placing these 'yo-yo' retractable lanyards is easy, fast and safe.

My other thought is to contact one of the firms that specializes in catalyst change-out and exchange resin bed cleaning. They can tell you what is the quickest designs to work on, and their safety preferences. My googling got "Clean Harbors" and "Envirosystems"

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources