INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Settlement of a breakwater

Settlement of a breakwater

Settlement of a breakwater

(OP)
How do I assess this?!

RE: Settlement of a breakwater

rubble mound, caisson, piered?
clay, sand or rock foundation?
settlement of the foundation, core or armor?
short term settlement, creep, piping and erosion, seismic, liquifaction?
global instability, subsidence of toe berm?

suggest perhaps the following:
USACE EM 1110-1-1904 Settlement Analysis
USACE EM 1110-1-1905 Bearing Capacity Of Soils
USACE EM 1110-2-1902 Stability of Earth and Rock Fill Dams

RE: Settlement of a breakwater

Ger at least one boring first.

RE: Settlement of a breakwater

(OP)
rubble mound
sand foundation
settlement of the foundation
short term settlement
Is global instability not assessed separately to settlement?

uk breakwater, so require european manual

thank you!

RE: Settlement of a breakwater

(OP)
have boring data/si

RE: Settlement of a breakwater

(OP)
thanks

RE: Settlement of a breakwater

I'd not get too concerned about settlement before you are sure it won't sink out of sight. A global stability evaluation would be the first step. For your soil data you need some information about relative density if sand soil. That will help with the stability check as well as estimating settlement. For a rubble breakwater, I's guess settlement won't be an issue even if some occurs, providing the stability check is OK.

RE: Settlement of a breakwater

(OP)
How do I assess global stability then? Settlement is an issue in terms of the overall height, and hence costs. Thanks again

RE: Settlement of a breakwater

with a sand foundation, you will have some consolidation which will occur quickly, but should not "sink out of sight". so global stability should be checked on the core material and using the weight of the armor or other superstructure as a surcharge loading. Estimate friction angle of your fill which I would assume is a well graded granular material, use fully saturated conditions and check for slope failure, check again for seismic and again for toe erosion, or provide an adequate toe berm. Finally, there will be some creep which should be estimated for your design life (50 years?). there will be some settlement and degradation of the armor, but really difficult to estimate that.

RE: Settlement of a breakwater

Assessing global stability can be done with the procedure for evaluating slopes or earth dams, as I see it. The slip circle technique is a common method. However, using some of the methods for determining bearing capacity based upon shear strength of the supporting soil also can be used. If you have not experience or training on how to use these, I'd suggest asking a practicing geotechnical engineer.

RE: Settlement of a breakwater

(OP)
ok, thank you

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources