INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

RTU on Existing Bar Joists

RTU on Existing Bar Joists

RTU on Existing Bar Joists

(OP)
I don't mean to revive a dead horse here but I'm curious to know one additional item that really didn't seem to be covered in this otherwise very good thread:
http://www.eng-tips.com/viewthread.cfm?qid=354675

When using the inverted channel detail (Fig 5.4.2 from "Designing with Vulcraft"). What do you typically detail for the case when the curb runs parallel to the joist?
It seems in this case you would need to an angle frame below the RTU with blocking. I suppose the blocking could be short pieces of the C6x8.2 but you still introduce the need for an angle frame. In which case I wonder if it is easier to just you an angle framing in general?

Thanks!

EIT
www.HowToEngineer.com

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources