INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Parts List and BOM

Parts List and BOM

Parts List and BOM

(OP)
On an engineering drawing what is the differnce between a Parts List and a Bill of Materials ?

RE: Parts List and BOM

What term does your boss (your company culture) prefer to use?

RE: Parts List and BOM

Where I came from, a 'Parts List' was associated with a particular item and included the parts needed, which could include any sub-assemblies as single items, to assemble someething to what was shown on the Drawing/Specification that the 'Parts List' was being referenced by.

As for a 'Bill of Material', that was a complete list of all of the parts needed to manufacture a particular finished product. And depending on how options and exceptions were handled, this BOM may or may not be a roll-up of all of the 'Parts Lists' of the sub-assemblies that made up the final product. Also there could be different types of BOM's. For example, if many of the parts were manufactured in-house, there might be a 'Manufacturing Bill of Material' which could include raw material and even items consumed during manufacturing such as welding rod/wire, expendable tooling, paint, adhesives, etc, which might not be explicitly listed in the 'Product Bill of Material'.

John R. Baker, P.E.
Product 'Evangelist'
Product Engineering Software
Siemens PLM Software Inc.
Industry Sector
Cypress, CA
Siemens PLM:
UG/NX Museum:

To an Engineer, the glass is twice as big as it needs to be.

RE: Parts List and BOM

Hi
Where I work they mean the same thing.

RE: Parts List and BOM

Ditto here.

Tunalover

RE: Parts List and BOM

In most industries the terms are interchangeable. For engineering documentation on a US defense program the preferred term is parts list. And with the current trend towards Model Based Definition engineering practices (ie. no drawings), the parts list is usually part of a document that includes general/flag notes and any application/effectivity data.

Since a "parts list" often includes bulk materials (like paint, adhesive, sealants, etc.) that are used to produce the part/assembly, or when a "parts list" for a machined component only consists of a single entry describing the raw material used to make the part, a more correct term might be "parts and materials list". But as racookepe1978 notes, ultimately what matters is whatever your company or customer prefers to use.

RE: Parts List and BOM

As I noted above, US DoD contracts usually require a very specific format for parts lists. It is usually in the form of an Indentured Parts List (IPL), where the line of parts used at the next assembly are indentured from the line of the next assy level. The IPL usually is structured to match the contract Work Breakdown Statement (WBS) and the contract Statement of Work (SOW) that defines the products that must be delivered.

RE: Parts List and BOM

Tbuelna, by indentured do you mean indented?

Ted

RE: Parts List and BOM

Indentured, because the list is, in fact, indented, but also, sub-assemblies are bound (indentured) to the next higher assembly.

Typically an IDL is just a list of drawings. Our BOM usually covers the quantities required to build the system, and the the procurement details, like price and delivery.

TTFN
FAQ731-376: Eng-Tips.com Forum Policies

Need help writing a question or understanding a reply? forum1529: Translation Assistance for Engineers

Of course I can. I can do anything. I can do absolutely anything. I'm an expert!

RE: Parts List and BOM

To illustrate why you need to clarify what YOUR company needs - WITH your boss, NOT with us! - is easy to show. An assembled single flange requires 16 1/2 inch stainless steel nuts, but you have 8 flange assemblies in 4 "units" contracts going to one customer at one site, and 2 units going to the same customer at a different site.

how many nuts are on the drawing for one flange subassembly?
How many nuts do you buy per unit?
How many are purchased by your company?
How many are charged to each customer and each customer's job order?

RE: Parts List and BOM

I can think of one other example were "Bill of Materials" might be more correct than "Parts List". What about the drawing for a laminated composite part? The plies used are materials rather than parts, right?

RE: Parts List and BOM

BTW the right abbreviation for Bill of Material is B/M, not BOM. This is per ASME Y14.38 and MIL-STD-12.

Tunalover

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources