INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Preservation, Lay Up and mothballing different

Preservation, Lay Up and mothballing different

Preservation, Lay Up and mothballing different

(OP)
Sometimes I have this terms: Preservation, Lay Up or Mothballing have a same meaning or similar definition.

But i know exactly there are a clear definition which make them different

Can Anybody help me how to distinguish the meaning of each terms mentioned above?

Thanks you for your answer and explanation

Best Regards
Zachari Alamsyah

RE: Preservation, Lay Up and mothballing different

Preservation of idle equipment installed in the plant involves safeguarding unattended and inactive equipment from deterioration during a down period. Deterioration of equipment during periods of down time is usually caused by conditions entirely different from those that exist during operation. Many deposits formed during operations turn usually corrosive under shutdown conditions. Moisture, oxygen, dirt, dust, ultraviolet rays, extreme pressure and temperature, corrosive environment of coastal areas and closeness to other chemical plants, are the some of the
factors causing deterioration. Preservation of static and rotary equipment and their spare parts, which are required to be kept in store for prolonged periods, needs to be carried out to prevent their deterioration, and as such preservation procedures for the equipment/spares kept in store should be adopted. New equipment received at project sites should be preserved considering manufacturer’s recommendations.

Short-term layup: is also known as seasonal layup. Usually, this period extends for three months or less, so no equipment dismantling is involved. Little or no maintenance is performed and all components are left ready to run.

Extended layup: could be anywhere from 3 to 24 months and may have an undetermined timeframe. Typically, steps must be
taken to prevent corrosion and air and moisture intrusion. Drainage may be necessary for fluids, temporary heaters or
dehumidifiers could be required, and certain equipment may be isolated or disconnected.

Mothballing: is similar to extended layup, but the timeframe is indefinite - usually well over 12 months. It would require major work and expense to restore operations. The owner may elect to sell off pieces of equipment, or the entire plant.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources