INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Bolted connection between pile cap and pile.

Bolted connection between pile cap and pile.

RE: Bolted connection between pile cap and pile.

It looks like investing two dollars to save one by the time you jig up and drill those holes on opposing sides.

Michael.
"Science adjusts its views based on what's observed. Faith is the denial of observation so that belief can be preserved." ~ Tim Minchin

RE: Bolted connection between pile cap and pile.

(OP)
Sorry I missed one information. Pile cap plate and 356 mm Diameter pipe is connected by all around 8mm fillet shop weld.

RE: Bolted connection between pile cap and pile.

(OP)
Few bolt connections will be shop drilled. My supervisor things we will be able to save money this way. I am concern about saving money along with pile movement and stability issue between pile cap and pipe bolted.

RE: Bolted connection between pile cap and pile.

I doubt it will work out to be a savings. Screw piles are notorious for wandering during installation and the bolted connection will end up field welded 85% of the time.

RE: Bolted connection between pile cap and pile.

(OP)
It seems to me that adding up all the field drill & field bolting time and probability of field weld due to pile movement, will make the project more costly than straight field welding for everything from the beginning.

RE: Bolted connection between pile cap and pile.

If you have the welder on site to do some connections, may as well let him/her weld it all. The expense with field welding is not making the welds, it is mobilizing the trade. And since you cannot add capacity of bolts and welds, you'll probably end up welding it all anyway.

I agree with Brad, and you may well end up with the need for holes where you cannot drill and bolt without conflict.
Also, if you are planning one-for-one pile-for-column as drawn, chances are good you will have large eccentricity.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources