INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Flexible steel pipe on embankment

Flexible steel pipe on embankment

Flexible steel pipe on embankment

(OP)
Hi all,

I have a question regarding a steel pipe which will be buried in an embankment. Using the Marston-Spangler theory, the dead load on top of the pipe will be the full amount of the soil prism above the pipe, I get that.

My question lies with the way to determine the pipe's deflection: is the Iowa formula valid for both trench and embankment conditions? It takes into account the modulus of soil reaction E' which depends (refering to table 6-1 of AWWA M11) on the depth of cover, type of soil and relative compaction of the fill soil.

Intuitively, I am inclined to think that the passive resistance of the lateral soil would be greater in a ditch rather than in an embankment - the soil adjacent to the ditch is much more consolidated than the soil of a new (though compacted) embankment, so it will offer better lateral support.

Any thoughts? Thank you!

RE: Flexible steel pipe on embankment

If the pipe is parallel to the run of the embankment, you will have different loads on each side, one greater than the other due to the greater overburden on that side. If the overburden is significant, find a different formula.

Since the trench is overexcavated at least 12" in width to each side of the pipe, the sides of the trench itself do not contribute to the system. Compaction of the backfill into the space between the pipe and the side wall is what provides lateral stability, and that is approximately equal in both types of trenches.

you must get smarter than the software you're using.

RE: Flexible steel pipe on embankment

(OP)
Thank you for your reply, but I don't quite follow you.

What I meant was that I have an installation similar to the picture on the right side of the attached file as opposed to the left side. I don't understand how I will have different loads on each side if the embankment covers all of the pipe in the same way on both sides.

Quote (BigInch)

Compaction of the backfill into the space between the pipe and the side wall is what provides lateral stability, and that is approximately equal in both types of trenches.

Even if the side wall is significantly away from the pipe (say, 10 or 12 m)? A proper soil compaction won't be a problem.

RE: Flexible steel pipe on embankment

OK. You should have included the drawing to begin with.
All the soil in the trench in the left diagram needs to be compacted.

You're right, there are different factors for burying in fill, as the side support is markedly weaker. There is a Corps of Engineers publication that addresses those two conditions and combinations thereof,
http://www.publications.usace.army.mil/LinkClick.a...

you must get smarter than the software you're using.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources