INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Mechanical splice of GFRP rebar

Mechanical splice of GFRP rebar

Mechanical splice of GFRP rebar

(OP)
So, ran into an issue where we specified a continuous GFRP rebar in the interior of the top slab of a underground steam pit structure. Construction of the cast in place slab has just finished and we were about to begin casting the precast walls and top slab. All concrete will use GFRP (fiberglass) rebar as the design life of this structure is 100 years. Steam and condensation cause serious serviceability issues with carbon steel rebar in these pits we've found and they need this particular pit to last as it's cost them about $700/sq.ft. to replace these pits. Due to the potential of steam leaks and high temperatures reducing the bond strength (90% loss of bond strength calculated) we had all the bars developed away from areas that could see high temperature steam in the event of a gasket or pipe lets go. However, we just discovered that the bars delivered have be setup for a 4 ft splice right along the interior of the top slab, the worst spot for high-heat. At 10% normal bond strength I calculated a required splice of over 300 inches (hah, not happening).

So, my long-winded question is has anyone had any experience with mechanically splicing FRP rebar? Anyone got any good ideas for increasing the bond strength of GFRP rebar at 300 degrees?

Attached is a picture of the bars for those who haven't seen GFRP rebar up close. It's fibers in a vinyl ester epoxy binder with what appears to be sand or something else on the exterior surface to roughen the bars and develop the bond.

Maine EIT, Civil/Structural.

RE: Mechanical splice of GFRP rebar

Last time I wanted to use FRP for slab, I had a hard time trying to get the shear to work. The code gives you a such lower # for concrete shear strength compared to steel. How did you get the shear to work?

RE: Mechanical splice of GFRP rebar

(OP)
Had the same issues, we made the slab 14" thick.

Maine EIT, Civil/Structural.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources