INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

H2S system

H2S system

H2S system

(OP)
We have an H2S delivery system feeding from a one ton cylinder. It is all small flow rates 10 lb/hr max and small bore 1/2" pipe and tubing. We had issues with a regulator, one of which was needing to apply steam to get needed rate, so we upgraded materials and removed the regulator to operate at roughly 250 psig. The feed is off the gas draw off. We thought removing the regulator would eliminate the need to heat the high pressure gas but it has not. The flow becomes erratic and can't meet set point unless the steam is applied to the piping externally. There are no indications of two phase flow and all components should be able to provide the needed flow. I am at a total loss as to why we can't maintain such a low flow with 250 psig supply gas through 1/2" tubing. Any one have any thoughts?
Thanks

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources