hello, i'm newbie in here
i want to know how long the time needed for water filling, hydrostatic test, and pneumatic water test for Ammonia Tank with capacity 20.000 MT. if we use 6" pipe for filling the tank with water.
Thank you
i want to know how long the time needed for water filling, hydrostatic test, and pneumatic water test for Ammonia Tank with capacity 20.000 MT. if we use 6" pipe for filling the tank with water.
Thank you





RE: Full Water Test Procedure
A reasonable flow rate in a 6" pipe(3m/sec) gives a flow of about 200m3/hr, so about 150 hrs +/-a couple of days
Pretty vague question so a pretty vague answer.
My motto: Learn something new every day
Also: There's usually a good reason why everyone does it that way