INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Onshore Buried Pipeline having two Material of construction

Onshore Buried Pipeline having two Material of construction

Onshore Buried Pipeline having two Material of construction

(OP)
onshore Pipe line, that will be carrying Gas +Condensate well fluid from an on shore well pad to the Gas oil separation plant. The length of pipe line is approx. 40 km. underground portion of which is made of sour rated and externally 3 LPE coated carbon Steel . Above ground portion of the pipe line where the well pad is connected is made of SS 316 L and is externally hot insulated. Well fluid (gas + condensate)carries H2S of 6 to 8 Mole %, CO2 of 10 mole % and water of approx. 25 mole %. Temperature of well fluid is around 80 deg C and pressure = 100 bar. The Chloride level in the produced (formation) water is around 150,000 ppm.

i am evaluating this study for its damage mechanism. list of damage mechanism that susceptible for this study are :
1)H2S cracking
2)HIC
3)CL SCC
4)Corrosion Erosion

my suggestion are as follow :
for buried pipeline - to change its material to super duplex material n control its CP to -850mV to -450mV.

any comments on the study?

RE: Onshore Buried Pipeline having two Material of construction

1. Review ISO 15156-3 and work out how you plan to get 316L and duplex SS into the frame with that amount of H2S and chloride
2. Create a degradation mechanism checklist from API RP 571 and the Energy Institute Guidance For Corrosion Management and add in 'long running ductile fracture'
3. Have a go at life cycle costing the options

Steve Jones
Corrosion Management Consultant

http://www.linkedin.com/pub/8/83b/b04

All answers are personal opinions only and are in no way connected with any employer.

RE: Onshore Buried Pipeline having two Material of construction

40 km of super duplex, sounds expensive.... Have a look at how other operating companies (or regions) operate similar pipelines to what you have.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources