Effect of mixing exist base material and high PI subgrade and Lime Stabilizing
Effect of mixing exist base material and high PI subgrade and Lime Stabilizing
(OP)
I am rebuilding an old road in Texas. The proposed section is 1.5" type'D' Hmac over 2.0" Type 'B' HMAC over 8.0" A2Base, over 6" lime stabilized subgrade. The existing road section was thicker than the proposed because of 9-inches of existing asphalt.
What would be the effect of mixing 2-inches of base material with 4 inches of high PI natural subgrade and lime stabilizing it?
Would this subgrade section have about the same structural number as 6 inches of lime stabilized high PI natural subgrade?
thanks in advance for your support.
What would be the effect of mixing 2-inches of base material with 4 inches of high PI natural subgrade and lime stabilizing it?
Would this subgrade section have about the same structural number as 6 inches of lime stabilized high PI natural subgrade?
thanks in advance for your support.





RE: Effect of mixing exist base material and high PI subgrade and Lime Stabilizing
Considering your existing pavement section, have you thought about mixed in-place recycling? You could do a 10 or 12 inch depth mix and make a very stable base for an asphalt surface. This would likely be very cost effective for your client. Check it out.
RE: Effect of mixing exist base material and high PI subgrade and Lime Stabilizing
I agree with Ron on the both the need for lab tests and the effectiveness of full-depth reclamation.
RE: Effect of mixing exist base material and high PI subgrade and Lime Stabilizing