INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Welding maps

Welding maps

Welding maps

(OP)
Hi,

May someone help me whit these composed question:

Why and for what to do a welding map?.

Are there some standar or text of reference about the elaboration of welding maps. I´m familiarized with the welding maps for piping systems but, is these a often practices for structural steel constructions??

Thanks in advance for your help.

Regards

RE: Welding maps

Welding maps are used to track location, size (length and depth) and welder ID associated with repair welds. Weld maps, if done correctly, can be of tremendous help in the event problems develop with quality issues or service-related issues.

Weld maps should be part of your Quality Assurance program if you fabricate critical components or repair critical components, or the client requests it.

RE: Welding maps

A weld map with WPS, welder, and NDE is not often done for structural steel welding in the field. The drawings do establish weld type and sizes.

RE: Welding maps

Being a welding inspector myself with a specialty in structural steel - I can tell you that all of the capital projects we do ( Mostly power plant maintenance/EPA mandated system retrofits ) require that we track all of our welding - be it structural or pressure welds. Obviously we have engineered drawings that we are building everything to on new projects, so I just write the welders I.D number and the date I accepted said weld , right on the prints themselves.

When ever we do boiler outages and I am keeping track of pressure welds, I use a microsoft excel sreadsheet with the tube number or element number - who rooted/flushed/capped the weld , welder I.D's and the date I accepted it. Also when it was NDE'd ( more often than not x-ray'd) and if it passed or was rejected and then repaired and re-xrayed.



Hope this helps

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources