INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ASME B31.3 Branch Connection through weld

ASME B31.3 Branch Connection through weld

ASME B31.3 Branch Connection through weld

(OP)
We are getting ready to install some o-lets on a piping run per customers drawing. One of the o-lets is located in the center of a circumferential butt-weld. The butt weld has been 100% radiographed prior to the o-let installation. A co-worked asked if this was allowed by B31.3? I've looked through the book multiple times and cant find anything that discussed it.

I've told the specific PM to contact Customer Inspector for clarification. Even doing so, I would still like to know where to find clarification in the book to make sure we are ok. I don't think its a good idea if everyone built stuff per customers recommendations, I am a firm believer in Manufactures responsibility as well. I want to agree/disagree with their clarification based on the code. Thanks in advance!

RE: ASME B31.3 Branch Connection through weld

Allowed by B31.3? B31.3 (most probably) does not specifically prohibit this circumstance. B31.3 sets out minimum requirements for piping system to ensure a safe operation. It is up to the Designer to design the piping system to the extent necessary for safe operation. Do you deem this to be a problem?

Some information on material of construction, line size, wall thickness, service etc. can be helpful to users here assist in this query.

RE: ASME B31.3 Branch Connection through weld

(OP)
Pipe is SA312-TP316L, Line size is 6" Sch. 40, Branch is 1" Thread-o-let A182-F316L 3M. Service I am not to sure of as this is another PM's project. We didn't design the system, customer had a third party engineering service.

Personally no, I wouldn't see this as a problem but my strength is Section VIII as I deal mostly in Pressure Vessels. The joint has been radiographed and holds a joint efficiency of 1.0 so to me its just like were installing a coupling on the piece of pipe.

The question was posed to me and I'm cautious at times giving a direct answer without finding any reference in the code book. I would say its good practice to try and avoid doing so but when its necessary and the joint has been radiographed it is ok.

I didn't want to give them the go ahead and then somebody find in the book where its prohibited, wanted to make sure I wasn't missing something. In all instances I always suggest sharing the question/solutions with the customer to assure they concur, and our AI when applicable.

RE: ASME B31.3 Branch Connection through weld

I'm not aware of a B31.3 prohibition of this practice. We avoid it because it looks bad. We also avoid, but do not control, branch welds which intersect the long seam weld line of a welded seam pipe.

RE: ASME B31.3 Branch Connection through weld

I have seen client specs stating clearly that no new welds on any weld previously done on the pipes.
Try to avoid it. Seek some other location for olet.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.