INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Riser tie in and dewatering

Riser tie in and dewatering

Riser tie in and dewatering

(OP)
Hi

This is my first post on the forum so I hope this ends up in the correct area.
I am currently doing an assignment for my masters which concerns the installation of risers and have a couple of questions that I have struggled to answer through my own research.

Firstly, In order to tie in a SCR or Flexible riser to the pipeline is it necessary to lay the riser down with a riser base attached, allowing for connection to the PLEM with a spool? Or can the riser end be easily manoeuvred to the subsea tie in point on the sea floor with ROVs?

Once the riser is tied into both the pipe line and topside, how is it de watered? I am assuming that sea water floods the riser during installation (is this correct?). I am thinking that the riser must be dewatered with nitrogen purging.

Any advice would be greatly appreciated.


Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources