INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Cable stayed bridge - connection at an abutment column to prevent uplift

Cable stayed bridge - connection at an abutment column to prevent uplift

Cable stayed bridge - connection at an abutment column to prevent uplift

(OP)
What is the best way to connect the end of deck girder to the top of an abutment column of a cable stayed bridge? The support is connected to both the stiffening girder and a back-stay cable. The support has to be able to resist an uplift force (from live load) and to move longitudinally.

RE: Cable stayed bridge - connection at an abutment column to prevent uplift

There are two methods to accomplish this, use of steel tie-down links or concrete ballast. The tie-down links will resist the tension while permitting longitudinal movement through pin connections. The method of concrete ballast will aid in eliminating uplift and permit the longitudinal movement more or less as a typical bridge does.

Regards,
Qshake
pipe
Eng-Tips Forums:Real Solutions for Real Problems Really Quick.

RE: Cable stayed bridge - connection at an abutment column to prevent uplift

I like concrete counterweights because they are less likely to have corrosion issues. They are not so good in high seismic areas though. Making the cable stayed back span continuous with the approach spans can be helpful. This also provides protection for deicing salt if you are using tie-downs.

RE: Cable stayed bridge - connection at an abutment column to prevent uplift

(OP)
Thank you Qshake and greybeach for comments. I am trying to use concrete infill over a length next to the end of the steel girder box to resist uplift under dead load condition. Under dead and live loading condition, hold down bearings will resist uplift forces.

RE: Cable stayed bridge - connection at an abutment column to prevent uplift

If you do go with the steel tie-downs, do some extra due diligence. I recall reading about or seeing a presentation on a cable stayed bridge having problems with rods cracking. Accurately defining stress ranges, details, materials selection, and maintenance are all very important.

IC

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources