Cable stayed bridge - connection at an abutment column to prevent uplift
Cable stayed bridge - connection at an abutment column to prevent uplift
(OP)
What is the best way to connect the end of deck girder to the top of an abutment column of a cable stayed bridge? The support is connected to both the stiffening girder and a back-stay cable. The support has to be able to resist an uplift force (from live load) and to move longitudinally.