INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Complete Section Beam Splice

Complete Section Beam Splice

Complete Section Beam Splice

(OP)
I have a situation where I must make a beam splice that requires the full section strength of the beam (CJP). The beam is a built up member with a flange thickness of 1.5" and a web thickness of 3/4". I am aware of the qualified welding requirements in AWS for this type of joint.

My question is:

1.) Do AWS or AISC require any sort of splice offset for the flange and web?
2.) Does the joint have to be a double bevel on both sides of the web?
3.) Are the weld access holes for beam copes required for splices as well?

Thank you.

RE: Complete Section Beam Splice

You don't say if this is a shop or a field splice.

I don't know of any requirement to stagger the joints but I could be out-of-date. The ones that I have been involved with were thicker plates than yours but we used single side joints for the flanges without ratholes because we could turn the girder over so both flanges had down hand welds. If you used two sided welds, or inside full pen welds for the flanges, you need the ratholes in the web to complete the weld. Honestly, you could have worked this last out with some thought.

Michael.
"Science adjusts its views based on what's observed. Faith is the denial of observation so that belief can be preserved." ~ Tim Minchin

RE: Complete Section Beam Splice

Engpes:
Since this is a built-up beam, why not splice the two flg. pls. and the web pls. as single (independent) members, in the flat, and then make up the beam member with fillet welds btwn. the completed (spliced) web pl. to the completed (spliced) flg. pls.? Just as you would build any plate girder or built-up beam member. Several different weld details are qualified for these types of spice welds. If you want full penetration splice welds you would start the weld on one side, then back gouge the root area from the other side and continue welding from both sides. This approach eliminates the difficult, discontinuous, welding condition in the ‘k’ region (the fillet radius region) btwn. the flgs. and the web. These welds can also be cleanly done, with run-out tabs, edges ground and cleaned up, etc. and NDT’ed for good QC.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources