INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ACI 350.3 Multicell Tank Question

ACI 350.3 Multicell Tank Question

ACI 350.3 Multicell Tank Question

(OP)
In designing a multi-cell concrete waste treatment tank (approx. 9.5m x 4m) with five compartments in series (1m-1m-2m-1m-3m), the following came up:

In ACI 350.3, the definition of "L" (for use in L/HL) states that L is the inside length of a rectangular tank parallel to the EQ direction. If a tank has multiple cells of varying size, does one use L for each compartment and, further, calculate Wi/Wl and Wc/Wl for each compartment separately.

Additionally, what are the realistic load cases that should be considered, taking into account construction works such as leak testing, backfill, with and without roof, etc.?

Thanks in advance for any replies.

Cheers.

RE: ACI 350.3 Multicell Tank Question

First of all, there's a lot of detailing and design customs for concrete tanks which are better transferred through your supervisor or someone who's done tanks before. For instance, there's load combinations from ACI, and there's load combinations which experienced tank designers use. And realistic doesn't necessarily play into it.
As far as the seismic mumbo jumbo, it very seldom controls for me, so for the multicell case, I would just use whatever gives me the greatest load. For the other load combinations, I design for the tank full (not operating level) to either the passive overflow or the top of walls. The tank should be designed for being full with no backfill and with backfill and no liquid. As far as the roof, if they're going to leak test without it, you'll need to check that case too.

RE: ACI 350.3 Multicell Tank Question

L is for each compartment I think.

Jed, seismic often controls in determining the freeboard. Most times you can't slosh out of the tank, so you need to have sufficient freeboard. Sloshing can often be 4 feet or more, so you get some pretty significant freeboards.

RE: ACI 350.3 Multicell Tank Question

And I would say unless you have a passive overflow once you add that freeboard, you need to design for the water at that height (top of wall). And that's likely to control.

RE: ACI 350.3 Multicell Tank Question

(OP)
Thank you for the replies.

Mr. Clampett, I am curious why you say that the seismic "mumbo jumbo" seldom controls. (by the way, seismic "mumbo jumbo" is a newly found technical term that I will sprinkle into my vocabulary in the future.) What typically controls?

Can anyone confirm if Gumpmaster is correct that L is for each compartment. I think he is, but I'd like to be able to say that with confidence.

Cheers

RE: ACI 350.3 Multicell Tank Question

You would not be wrong either way, so why complicate it. I go along with Jeb, fill the tank to the top for design, and with multi-cells "one empty, one full", sometimes openings in dividing walls are closed for repair work.

Michael.
"Science adjusts its views based on what's observed. Faith is the denial of observation so that belief can be preserved." ~ Tim Minchin

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources