INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

New to AASHTO and Bridge design, please help me

New to AASHTO and Bridge design, please help me

New to AASHTO and Bridge design, please help me

(OP)
Hi engineers,

I need your help to do my job in right way.
I got one bridge design (my 1st bridge design job), which is curve steel bridge. I had chosen the AASHTO specification for design. I had calculated the dead load, live load due to vehicle, construction load and still what are the forces I have to consider and how to calculate, please advice.
I am doing the analysis and design of bridge with the help of STAAD PRO V8i, I had tried the modeling and design, I got this warning “ **WARNING** EITHER FLANGE WIDTH-THICKNESS RATIO OR WEB HEIGHT-THICKNESS RATIO” what I wanna do please advice.
Please advise me in common about bridge design, please engineers.
Looking ahead for your help and guidance.

Arun S M.E
saruncivil@gmail.com

RE: New to AASHTO and Bridge design, please help me

These are questions that you should be asking your supervisor. Don't you have someone who can mentor you on something as complicated as this? Seems like a pretty complicated structure for no mentoring help first time out of the chute...

Mike McCann
MMC Engineering

RE: New to AASHTO and Bridge design, please help me

FHWA GUIDES and eaxmples: FHWA-IF-12-052, FREE TO DOWNLOAD.

I have not done a curve steel bridge yet.

RE: New to AASHTO and Bridge design, please help me

(OP)
engidudu, thank you for your reply with useful materials and i had downloaded and reading.

msquared48, you are right. this is the 1st bridge job to our office and no one aware about this so only i look all of your kind guidance and help, so that i can learn and gain knowledge from experienced and world class engineers like you.

RE: New to AASHTO and Bridge design, please help me

It is big task for a fresh hand to do a curved steel bridge.
we could have done one two years ago in MISSISSIPPI, but managed to avoid it in the lay-out stage after coordinating with roadway guys.
it was a long bridge, with two steel spans in the middle, two opposite direction horizontal curves and vertical curves. we avoided horizontal curves on steel spans knowing that it would be much easier to deisgn steel spans

RE: New to AASHTO and Bridge design, please help me

I don't have my AASHTO with me, and I never used STAAD for bridge design, but it sounds like you're model doesn't comply with the geometric requirements in AASHTO.

Curved girder design is nothing to be afraid of. Although if the bridge is being constructed in stages it can be tricky.

RE: New to AASHTO and Bridge design, please help me

Your situation seems crazy to me, if you are designing a bridge you need someone experienced in bridges to oversee and take responsibility. Though codes today make it seem cookbook, it is not, as there are things not obvious! For example, just to scratch the surface, to correctly model a low radius curvature it will require FEM as oppose to 2D analysis.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.